Initial operation, Putting the power strip into service, Operation – Brennenstuhl Eco-Line extension socket energy meter EM 235 5-way white 1,5m H05VV-F 3G1.5 User Manual

Page 28

Advertising
background image

28

GB

Prior to Initial Use / Initial Operation / Operation

10. Press the SET-Button

4

to confirm your entry. The hundredths place after the comma

will blink.

11. Press the UP-Button

5

until you reach the desired value.

Example: 15,99

12. Press the SET-Button

4

, to confirm your entry.

Note: As soon as the overload value you entered is exceeded by one of the electrical
devices connected, the

OVER LOAD WARNING indicator will blink. The button’s

functions are deactivated.

i

Unplug the electrical device from the power strip and if necessary re-set the over-

load warning value.

Q

Initial Operation

q

Putting the Power Strip into Service

i

Plug the power strip’s mains plug into a correctly installed electrical outlet.

i

The LC-display

2

shows the time (

CLOCK), day of the week, current voltage

(

VOLTac) as well as the current line frequency (Hz). This display combination is

the standard display.

i

Now you can plug the desired electrical devices into the sockets

1

.

Q

Operation

CAUTION! POTENTIALLY FATAL DANGER OF ELECTRICAL SHOCK!

Only perform measurements at voltages of over 25 V~ in compliance with the relevant

safety regulations for the attached electrical devices.

CAUTION! DANGER OF INJURY! Never exceed the maximum prescribed

input voltage.
Note: The power factor shows how high the ratio between the real output and apparent
output of an electrical device. The power factor can lie between 0 and 100. In the
ideal case, the power factor will be equal to100.
Note: You can still access the following functions when the power strip is no longer

Steckdosenleiste_Content_DE_GB_NL_SE_ES.indd 28

23.07.14 13:23

Advertising