Nstallation, Unpacking the switch – D-Link DES-2218 User Manual
Page 25
Advertising

3
3
I
NSTALLATION
This chapter explains how to unpack and install your DES-2218 Ethernet
switch.
Unpacking the Switch
Open the shipping carton of your switch and carefully unpack the contents.
The carton should contain the following items:
♦
One DES-2218 Ethernet/Fast Ethernet switch
♦
One AC power cord
♦
Four rubber feet to be used for shock cushioning
♦
Eight screws and two mounting brackets
♦
This User's Guide
Inspect the switch and all accompanying items. If any item is damaged or
missing, report the problem immediately to your dealer.
Advertising