The BE1-11 is capable of transmitting the following items on an IEC 61850 network:

•

Configuration Settings

•

Metering

•

Status

•

Alarms

•

Targets

•

Breaker Operations

•

Direct Control

•

Fault Records

•

Load Profile

•

Oscillographic Records

•

Sequence of Events Reports

•

Unsolicited Reports

•

Peer to Peer Control GOOSE

•

Device Discovery

IEC 61850 Configuration

IEC 61850 Standard

The IEC 61850 standard defines the parts for communicating information between IEDs in a substation.

Figure 2 illustrates the Basler IEC 61850 configuration process.

Figure 2. Basler IEC 61850 Configuration Process

BESTCOMSPlus

®

BESTCOMSPlus software is provided with the BE1-11. Refer to the BESTCOMSPlus chapter for more
information.

BESTCOMSPlus performs the following tasks:

•

Maps BE1-11 inputs and outputs to IEC 61850 data points that can be read directly with an IEC
61850 browser

•

Uses a point-and-click method to configure BE1-11 settings and logic

•

Uploads and downloads BE1-11 settings files

•

Provides metering and reports from the BE1-11

Substation

Configuration Tool

SCD file

Basler

BEST61850

Validate SCL

and Map GOOSE

Basler

BE1-11 System

Basler

BESTCOMSPlus®