In order to ensure a correct functioning of CP-Link 3, please note the following hints concerning the cabling for the CP-
Link 3 participants.
Note the hints listed in the Network Topology section.
Always run the network cables separated from power cables. Use (sufficiently) shielded network cables.
Ensure all CP-Link 3 participants to have the same zero potential in order to avoid potential equalisation via the
network cable.