BECKHOFF C1300 User Manual

Page 44

Advertising
background image

C1300 VME to II/O Interface Unit

Beckhoff II/O-System

Page 44 of 44

Version : 2.01

Date : 18.12.95

5.3. Installation on the VME Card Cage

1.

Switch off the VME system and external power supply.

2.

The module is installed in a slot of the VME Card Cage

A VME system run will also start the C1300. But before running the C1300, all fiber optic
connections have to be established and the C1300 must be configurated correctly.

Advertising