Step 3 step 4 step 6 step 5 – Blu Bathworks TEU211 User Manual

Page 10

Advertising
background image

2014-01

1 866 907 0122 blubathworks.com

®

9

2013-11

1 866 907 0122 blubathworks.com

®

3

Step 3

Step 4

Step 6

Step 5

If required, use the supplie template to mark the
position of the control mixer fixing holes in the
selected location.

Important:
• Flush through the pipework before connection
• Filter screen for inlet is highly recommended

Fully insert the inlet hoses (M10) into the inlet valves
(Hot & Cold).

Fix the control box in position using the
screw kit supplied.

Attach outlet hose. Do not over-tighten.

H

C

M10

Hand-tighten inlets only.

Advertising