r the installation of the

u er, tank, and controls have been completed and

refully checked.

3)

ca
pu
res

4)
5)

6)

7)

op

8) Cl

ad
sh

AS

OIL

3.
4.
5.
6.
7.
8.

limit “OFF” setting.

,

h

test shall cover the

llowing points: CO2 in the flue gas by analysis, draft,

the flue gas by analysis shall

not be less than 8%.


s


r and not more than 12 inches from the

ion. The stack temperature shall be



m

4)

ex
at

5)

s

6) In

in

ma




GAS

1.

h

2.
3.

i

4.
5. Fla
6. M

.

Adjusting the Burner – Afte

rn

b
all wiring ca
1) Leave line switch open and set thermostat well

above room temperature.

2) Make sure that the resetting device on the control

panel is in operating position.
Set can at gauge port or bleeder tube opening to

tch oil. Close line switch and allow burner to

mp oil until flows clear. If control locks out,

et, and when oil comes out clear, open line

switch and replace plug or gauge.

Close line switch. The burner then should start.
Check oil pressure and adjust, if necessary, to

100 lbs.

Adjust air shutter on burner so that flame burns

clean with slightly smoky tips. Burner is shipped
with air shutter closed.

Start and stop the burner several times by

ening and closing main line switch.

ose main line switch and change thermostat
justment to below room temperature. Burner

ould stop.

G

Size – The burner shall be adequate size for the
furnace and the connected heating load as
recommended on the gas burner certificate by the
installer. Models and BTU input rating: See “Furnace
Specification” Section.




SEQUENCE OF OPERATION

Thermostat calls for heat.

1.
2. Protector relay energizes motor and ignition

transformer.
Pump supplies fuel to nozzle.
Burner ignites.
Furnace blower activates at blower “ON” setting.
Area is heated and thermostat is satisfied.
Protector relay de-energizes burner components.
Furnace blower continues to operate until fan

9. End of cycle.






Certificate – Following the installation of the burner

certain test data shall be obtained and recorded by the
installer on the gas burner certificate to be placed wit
each gas burner installation. The
fo
stack temperature, firing rate.

Requirements – The standard requirements as
approved by the industry are as follows:
1) CO2 – The CO2 in

2) Draft – The draft shall be in accordance with

specifications in the manufacturer’s installation
manual. An automatic draft regulator or it’
equivalent is required.

3) Stack Temperature – The stack temperature shall

be measured on the furnace side of automatic draft
regulato
smoke connect
measured at the certified firing rate. If an automatic
draft regulator is built into the furnace, such
regulator shall be closed when the stack
te perature is measured.

Firing Rate – The firing rate shall be based on the

burner manufacturer’s recommendation for the

isting total connected load. Burner shall be fired

that rate.

Smoke – During the above test, there shall be no

vi ible smoke at the chimney.

stallation Manual – The burner shall be installed

accordance with manufacturer’s installation

nual.

T
Burner motor starts and spark ignition begins.

lot valve opens.

ermostat calls for heat.

P
Pilot ignites.

me sensor proves pilot.

ain gas valve is opened

7. Burner ignites.
8. Furnace blower activates at blower “ON” limit

setting.

9. Area is heated and the thermostat is satisfied.
10. Thermostat de-energizes burner components.
11. Furnace blower continues to operate until fan

limit “OFF” setting.

12. End of cycle.