Direct vent kit for basement installation – Drolet SIT 0.820.634 User Manual

Page 13

Advertising
background image

ULTRA FLAME DIRECT VENT GAS STOVE

12

Direct Vent Kit for Basement Installation

1. Move the stove to its position;

2. Install temporary an 8 in.

section (4) to visualize where
the opening to be done thru the
wall. Center of the opening
should be at about 23 ½ “above
the base of the stove;

Note: Horizontal run should have a
slope of ¼ in per foot.

3. Make a 10-1/2" x 10-1/2"

opening in the wall, 23-1/2"
inches in order to introduce the
radiation shield thru the wall;

4. Cut the radiation shield to

length if necessary and install
as shown. Secure with four #10
1” wood screws;

5. Install the vent terminal (13)

with 2 ½ screws (12). You may
want to remove the vent casing
for easy access and
manipulation, Keep only in
place the wall plate;

Basement Installation

6. Insert the 8 in. pipe into the round

opening of the interior black wall
plate (7). Fix the insulation pad (9)
around the 8 in. pipe with the
aluminum tape;

7. Keeping the insulation joint of the 8

in. pipe down, insert it into the vent
terminal wall plate;

8. Secure the 8 in. pipe to vent terminal

wall plate with the metal screw;

9. Fix finally the vent terminal wall plate

with six 2 ½ in screws (12).

10. Insert the 5 in. flexible pipe (3) into

the 8 in. pipe and fix it to the vent
terminal casing. Use high
temperature silicone and one
locking band to secure it in pace;

NOTE: All joints must be sealed with
RTV silicone, 315

°C. (600°F)

temperature resistance.

CUT TO LENGTH

10-1/2" X 10-1/2"

OPENING

Advertising
This manual is related to the following products: