Gas piping, Electrical connections – Drolet SIT 0.820.634 User Manual

Page 17

Advertising
background image

ULTRA FLAME DIRECT VENT GAS STOVE

16

Gas Piping

• Move the ULTRA FLAME to the desired position.
• Mark the location for the gas inlet pipe and the

location where the vent pipes will go through the
wall. Remove the appliance.

• Route a 3/8" minimum NPT iron pipe gas line to the

desired location.

• Install a shutoff valve to the gas line. Tighten

securely using a pipe joint compound.

• Check the gas line piping for leaks. Use a soap and

water solution.

CAUTION: Do not use open flame to check leaks.

Electrical Connections

If you wish to make a direct electrical connection to the blower without using the six-foot cord supplied, route a
120 volt, 60 Hz electrical power supply line to the same location. Remove the power cord and connect the
120V line as per the following procedure:
• Unscrew the speed control unit and pull a few inches away from the junction box
• Unscrew the two marr connectors attached to the cord (P) and the cord ground
• Remove the cord and route the supply line through the same holes
• Make the electrical connection with the same wires the cord was attached to
• Screw the ground wire to the junction box (G)
• Screw the speed control unit back in place

P

P

G

CONNECT THE POWER LINE TO THE SAME

WIRES THE CORD WAS CONNECTED TO (P)

SPEED CONTROL

JUNCTION BOX

If you prefer to use the six-foot cord supplied, just connect it to a 120V outlet.

Advertising
This manual is related to the following products: