Cybex 13030-999 VR1 Row User Manual
Page 12

Cybex Owner’s Manual
12
If
Then
If machine needs
weight stacks
removed before
moving to desired
location.
5. Remove guide rod cap and springs.
6. Repeat procedure for opposite guide rods.
7. Remove spiral pin securing cable end to top weight using a 3/16”
pin punch and hammer.
Cable End
Top Weight
Spiral
Pin
8. Remove lifting post.
9. Remove weight plates
10. Move machine to desired position.
11. Remove the four shipping cones using a 3/4” socket or wrench.
12. Attach foot pads to each foot of frame.
Securely anchor machine to the floor
Cybex strongly recommends to maximize stability, equipment must be secured to a solid level
surface.
WARNING: Anchoring equipment:
•
Cybex is not responsible for the actual anchoring of equipment. Consult with a
professional contractor.
•
Use fasteners having a minimum of 500 lbs. tensile capacity (3/8’’ grade 2 bolts or
better).
•
If legs/frame does not contact surface, DO NOT pull down with anchors. Shim
any leg or frame not in contact with surface using flat washers.
Install weight plates
1. Install individual weight plates one at at time.