Installation, Install interactive whiteboard, Connecting the interactive whiteboard – Dukane LEADERBOARD LB77H User Manual

Page 9: 3.install battery in the electronic pen, Nstall, Nteractive, Hite, Oard, Onnecting the, Attery in the

Advertising
background image

Installation

1. Install Interactive WhiteBoard

z Wall

mounted

Select proper wall location, and install hanger parts on the wall. Then hang the interactive

whiteboard. (Prior to installation, please install the tray). Refer to the Installation

Diagram of

Interactive whiteboard.

z Bracket type installation( brackets are optional parts)

Assembly the brackets according to Bracket installation Diagram found with the brackets. Then hang

the interactive whiteboard. Refer to the

Bracket Installation Diagram>.

2. Connecting the Interactive WhiteBoard

z

Using the USB cable only; Connect it to USB port of PC, USB can supply the DC Power. The red
indicator lamp on the board input plate should light.

3Install Battery in the Electronic Pen

Turn the rear cap of the electronic pen counter-clockwise to open it, load one AAA 1.5V battery according

to the following figure, then tighten the rear cap clockwise. Battery positive (+) is toward the back of the

pen.

PEN TIP

8

Advertising