Installation – Fire Magic Island Blender User Manual

Page 2

Advertising
background image

2

NO. L-C2-30708

REV 1 - 0808011517

PREPARING FOR INSTALLATION

A grounded 110-volt GFI receptacle is required within 2' of
the desired blender location.

INSTALL THE BLENDER HOUSING

Prepare a cut-out in the countertop as specifi ed in Table 1 and
shown in Fig. 2-1. There must be a minimum of

1

/

4

" overlap of

the stainless-steel housing plate on all sides of the opening.
The countertop must be completely level for safe and effective
operation of this appliance.

Have a qualifi ed professional install a grounded 110-volt GFI
receptacle beneath the countertop so that the blender can
be plugged into it.

Silicon sealant may be applied around the top edge of the
countertop cut-out to create a barrier between the housing
and countertop capable of keeping fl uids out.

PLACE THE BLENDER IN THE BLENDER HOUSING

Open the domed lid. Unpack the blender and read the
instructions.

Attach the plastic plug to the three-pronged electrical cord.
Feed the cord through the cutout that is located on top of the
housing in front of the domed lid. Be sure to snap the plastic
plug in place. (See Fig. 2-2). From there, plug the cord into
the grounded electrical outlet.

Place the blender base carefully onto the blender feet
depressions that are located on top of the housing in front
of the domed lid.

INSTALLATION

Fig. 2-1

4"

8-

3

/

4

"

14-

1

/

4

"

4" clearance all
the way around

Blender

Fig. 2-2

Blender placement (side view)

Domed

lid

Cord into cutout

plastic plug

depressions

Advertising