Important Safety Note

Danger

Do not carry out any installation or
maintenance work unless the tank container
is completely empty and degassed.
Escaping vapours and gas can endanger life
and health of the person responsible for
installation and maintenance and cause
material damage.
Do not hold the device by means of the
operating lever.

Butterfly valves for tank containers must only
be installed by qualified staff.
Carefully read through installation instructions
before mounting the valve.
Use GESTRA genuine spare parts only.

3

Function

Butterfly valve (outer valve) with operating
lever for loading and unloading systems for
hazardous tank containers of IMO classes 1
and 2.

Opening:
Turn operating lever

A

anticlockwise through

90° and snap into position.

Closing:
Turn operating lever

A

clockwise through 90°

and snap into position.

Design

Main components:
Body for installation between flanges
Stem
Disc
Operating lever
Seat ring and gasket

Ancillary components:
Heating jacket
Hemisphere (as closure device)

Technical Data

Pressure/Temperature
Ratings

DN/NPS

80/3"

Service pressure

[bar]

6

[psig]

87

Min. service temp. [°C]

–10

Max. service temp. [°C]

190

Test pressure

[bar]

10

[psig]

145

Connection

For dimensions and further specifications
see data sheet.

Installation

The disc must be in the closed position when
installing the valve.

Fitting (Fig. 1)

1. Introduce two hexagon-head bolts

T

through bottom holes of the square flange
and place guide sleeves

V

onto bolts.

2. Introduce now the bolts with sleeves

T

and

V

through bottom holes of the CV 10

flange and secure with two nuts

U

.

3. Place the closed butterfly valve type KV 10

onto the two guide sleeves.

4. Put gaskets

W

and

X

between the KV 10

guide sleeves

V

and flanges. The gaskets

must be flush with the valve.

5. Introduce hexagon-head bolt

T

through top

left hole of the square flange.

6. Introduce this bolt

T

through the

corresponding hole of the CV 10 flange and
secure with nut

U

.

7. Proceed in the same way with top right

hexagon-head bolt.

8. Align the valve KV 10 and tighten nuts

manually. Take care that the gaskets are
flush with the valve.

9. Tighten the hexagon-head bolts

T

and nuts

U

gradually and in diagonally opposite

pairs with a torque of 80 ± 5 Nm.

Wafer design for
installation between
flanges with
centering sleeve

Important Note