Operation, Commissioning – Flowserve BB 1 User Manual

Page 15

Advertising
background image

5

Dual-plate check valves BB... do not require special preparations prior to their commissioning. If

the springs or O-rings of the dual-plate check valves BB ... have been replaced check plugs

A for

positive sealing and, if necessary, retighten them. Please refer to pages 2 to 23 for information on

torques.
If the dual-plate check valves BB... have not been properly positioned in the pipework or are fitted with

unsuitable springs the consequent vibrations and clattering of the plates will give rise to loud noises.

In this case either increase the capacity of the pump or replace the springs by suitable ones. Please

observe the installlation notes.
Do not attach objects to or tread on the damping cylinders

M of the dual-plate check valves BB with

dampers.

Operation

BB 1..., BB 2...

BB 1..., BB 2...

Commissioning

If the dual-plate check valves BB... have not been properly positioned in the pipework or are fitted with

unsuitable springs the consequent vibrations and clattering of the plates will give rise to loud noises.

In this case either increase the capacity of the pump or replace the springs by suitable ones. Please

observe the installation notes.
Do not attach objects to or tread on the damping cylinders

M of the dual-plate check valves BB with

dampers.

Advertising
This manual is related to the following products: