Flowserve E-Series Unibody Flanged User Manual

E-series unibody flanged end ball valves, Models efp1, Installation

Advertising
background image

McCANNA Valves

1. Installation

These valves may be installed in any position. The installation of these
flanged end valves require no special instruction—just the use of
good pipe fitting practices. Flanges conform to ANSI Standards B16.5
1988 Class 150 (ERP1 or EFP1) or Class 300 (ERP3).

2. Stem Seal Adjustment

If leakage is evident in stem packing area, tighten the adjusting nut

1

/

4

turn. If leak still persists, repeat above. Replacement of stem seals
(10) is indicated if the leak is still apparent after

1

/

2

turn.

3. Disassembly for Seal Replacement

a

WARNING: Begin with the valve partially open in a depressurized line.

A. Remove flange bolts and nuts (not provided) and lift body (11)

from line for servicing.

IM002G

E-Series Unibody Flanged End Ball Valves

Models EFP1:

1

/

2

" – 1

1

/

2

"; ERP1: 2" – 4"; ERP3: 1

1

/

2

" – 4"

Installation, Operation and Maintenance Instructions

Item

Description

1

Handle

2

Stem

3

Stop Pin (not shown)

4

Handle Retainer Nut

5

Travel Stop (1" and larger only)

6

Gland Ring

7

End Adaptor

8

Ball

9

Seat (2)

10

Stem Seals

11

Body

12

End Seal

13

Grounding Washer

14

Adjusting Nut

15

Seat Socket (

1

/

2

" – 1

1

/

2

" EFP1 & 2" ERP1 only)

16

Spacer Seal (

1

/

2

" – 1

1

/

2

" EFP1 & 2" ERP1 only)

12

8

11

9

13

6

1

4

2

14

5

Sizes

1

/

2

" – 1

1

/

2

" — Full Port CLASS 150 - EFP1

Sizes 2" – 4" — Regular Port CLASS 150 - ERP1

Sizes 2" – 4" — Regular Port CLASS 300 - ERP3

7

10

16

15

12

8

11

9

13

7

6

1

4

2

14

5

10

Advertising