Flowserve 051 000 Series User Manual

Page 3

Advertising
background image

3

Flow Control

Kämmer Control Valves

®

4

QUICK CHECK:

Before operating, check the valve as follows:

4.1

Open and close the valve, and observe the movement

of the actuator stem. The movement must be smooth

and linear.

4.2

Check for maximum stroke through change of signal

(for pneumatic positioners, 0.2 - 1.0 bar or corre-

sponding split-range values; for IP positioners, 4-20

or 0-20 mA).

4.3

Check all air connections for leaks.

4.4

Tighten packing nut (see table 1).

NOTE: An excessively tightened gland nut can cause

excessive packing wear and can hinder the free move-

ment of the plug stem.

4.5

Check fail-safe position. To do this, close supply pres-

sure and observe whether the valve opens or closes

as defined.

4.6

After use at fluctuating temperatures, re-tighten all bolt

connections and check for leaks.

5

MAINTENANCE

Check valves for correct function at regular intervals

(at least once every 6 months) as follows. This check

can be made when installed and in many cases

without interrupting production. If internal defects are

suspected, see section „Disassembly and Assembly of

Valve“.

5.1

Examine gaskets for leaks and if necessary re-tighten

bolts.

5.2

Check bellows gasket and test connection - if present

- for external leaks.

5.3

Check valve for damage caused by corrosive residues

or corrosive vapours.

5.4

Clean valves and repaint as necessary.

Warning: To prevent a buildup of electrostatic charge

clean the actuator/valve with a damp cloth only.

5.5

Check gland nut for correct torque (see table 1).

NOTE: An excessively tightened gland nut can cause

excessive packing wear and can hinder the free move-

ment of the plug stem.

5.6

If possible, open and close valve and check for maxi-

mum stroke and smooth movement of the plug stem.

Irregular movement of the plug stem may indicate

internal defects.

NOTE: With graphite packing, irregular movement of

the plug stem is normal.

WARNING: Keep hands, hair, clothing, etc. away from

all moving parts. Failure to do so can lead to serious

injury.

5.7

Check all accessories for firm seating.

5.8

If possible, close supply pressure and check the fail-

safe position.

5.10 Check stem boot (when fitted) for wear.

5.11 Check actuator for leaks. To do this, spray housing,

air connections and plug stem guide with leak spray

and check for any bubble formation.

5.12 Clean plug stem.

5.13 Check air filter, if present, and if necessary replace

insert.

NOTE: For further information regarding service and

maintenance please contact your nearest FLOWSERVE

office.

DANGER: On actuators with aluminium cases the

actuator springs must be renewed with original spare

parts every 10 years or after 50.000 operating hours

which ever occurs first.

Table 1: Standard torque values for gland nut

STOP!

STOP!

Thread

Stem Ø

(mm)

Torque in Nm

PTFE

Graphit

M20 x 1,5

6

2,5

6,0

M30 x 1,5

10

7,0

15,5

M38 x 1,5

16

17,0

38,0

M45 x 1,5

16

19,0

48,0

Advertising