Flowserve NAF-Setball ball sector valve User Manual

Naf-setball ball sector valve

Advertising
background image

1

NAF-Setball ball sector valve

Maintenance and installation instructions

List of spare parts

Fi 41.51(7)GB

08.11

Contents

SAFETY

General

1

Lifting

2

Receiving inspection

3

Installation

4

Flange gaskets

5

Starting up

6

List of materials and spare parts

7

Ordering of spare parts

8

Maintenance

9

To remove the valve from the pipework

9.1

To change the stem seal of O-ring type

9.2

To inspect and change the upper stem sealing,

Boxpacking

9.3

To inspect and change the upper stem sealing,

Boxpacking Zebra-CL™

9.4

To inspect and change the upper stem sealing,

Boxpacking Safeguard

9.5

To change the gasket at the lower stem

9.6

To inspect and change the primary and secondary

exhaust fuse

9.7

Fitting the actuator to the valve

10

SAFETY

- Assess all the risks to eliminate the risk of personal

injury and material damage. Read these instructions

thoroughly!

- Always use the necessary protective equipment

and comply with applicable safety directives when

working with hazardous or hot/cold medium.

- Never operate a valve without first ensuring that there

is no risk of crush injuries. The risk is highest with

automatic valves.

- Take necessary safety precautions to prevent

unintentional manoeuvre - i.e to atmosphere.

- Never dismantle a valve or part of a valve without

ensuring that the line is free of pressure and any

content.

- Always check that the valve type and material is

suitable for its intended use. This applies especially to

highly oxidising and corrosive medium. Observe also

the risk of erosion and explosion as well as decaying

medium. If in doubt, always request a written

recommendation from NAF AB.

1.

General

The instructions and list of spare parts as follows

are applicable to NAF-Setball ball segment valves in

accordance with data sheet Fk 41.51GB and Fk 41.54GB.

The product codes of NAF-Setball valves are as follows:

878XEX-XXXX

-XX

2.

Lifting

All lifting must be carried out

in the valve itself and not in the

actuator. The joint between the

valve and the actuator is de-

signed principally for carrying

the operating torque and the

deadweight of the actuator - see

Fig. 1.

Fig.1 Lifting of the valve

3.

Receiving Inspection

All valves leaving our works are inspected and tested in

accordance with the relevant requirements or in accordan-

ce with the special conditions specified by the purchaser.

Valves equipped with actuators are subjected to functional

testing and are adjusted in such a manner that every unit

is completely ready for direct installation in the pipework.

However, in view of damage that may have occurred

during transport, it is advisable that receiving inspection

is carried out, if possible.

We suggest the following inspection procedure:

-

Check that the valve delivered is correct in

terms of type, size, equipment, etc.

-

Examine the valve, actuator and valve positioner

regarding possible damages.

-

Check the settings of the limit stops.