Maintenance – Flowserve MK 45 User Manual

Page 14

Advertising
background image

14

Maintenance

– continued –

1. Observe note “Danger” on page 7.

2. Unscrew sealing plug L and remove strainer J.

3. Clean strainer, sealing plug and gasket seats.

4. Exchange strainer and sealing in case of visible signs of wear or damage.

5. Exchange gasket K if damaged.

6. Apply heat-resistant lubricant to the thread of the sealing plug (use for instance WINIX

®

2150).

7. Install sealing plug L with gasket K and strainer J. Tighten sealing plug with a torque of 120 Nm.

1. Observe note “Danger” on page 7.

2. Undo body screws A. Remove cover C from the body I.

3. Remove and clean capsule E. Unscrew nozzle insert F.

4. Replace capsule E in case of visible signs of wear or damage.

5. Clean body, internals and all gasket surfaces.

6. Apply heat-resistant lubricant to all threads and the seating surfaces of the nozzle insert and

the cover (use for instance WINIX

®

2150).

7. Screw in nozzle insert and tighten with a torque of 90 Nm.

8. Position capsule E onto the nozzle insert F and press evenly, such that the capsule snaps

into place.

9. Replace gasket H if there are visual signs of damage. Use the same cover C.

Always replace gasket H when using a new cover C or the cover of another steam trap.

10. Put cover onto the body. Tighten hexagon-head screws A alternately and in

several steps to a torque of 25 Nm.

WINIX

®

2150 is a registered trademark of WINIX GmbH, Norderstedt

Clean / exchange capsule and nozzle insert

Tools

Spanner A. F.16 mm to DIN 3113, form B

Spanner A. F. 22 mm to DIN 3113, form B

Torque spanner 20 – 120 Nm to DIN ISO 6789

Clean / exchange strainer

Tools

Spanner A. F. 30 mm to DIN 3113, form B

Torque spanner 20 – 120 Nm to DIN ISO 6789

Advertising
This manual is related to the following products: