Installation – Flowserve NRGS 16-1 User Manual

Page 11

Advertising
background image

11

Installation –

continued

Table 1

Function

e. g. First low-level alarm

e. g. Feed pump ON

e. g. High level alarm

e. g. Feed pump OFF

Function

Electrode rod

3

4

2

1

Length [mm]

Attention

■

The seating surfaces of the threads or flange provided on the vessel or
boiler standpipe must be accurately machined. Fig. 5

■

Do not bend electrode rod when mounting.

■

Do not lag electrode body.

Note

■

For the approval of the boiler standpipe with connecting flange the
relevant local and national regulations must be considered.

■

See four examples of installation on page 17.

Tools

■

Open-end spanner 41 mm A. F.

■

Bolt cutter

■

Hacksaw

■

Flat file, medium cut