Installation

3

3-1

Section 3

Installation


3.1 Installation

WARNING

Ensure that all power is removed, prior to connecting the
field wiring.


CAUTION

Personnel performing the following procedure must be
familiar with the operation of the monitoring system and
the location of each piece of equipment used in the
system.

CAUTION

Failure to install the equipment in accordance with the
information presented in the assembly drawings could
result in damage to the equipment.

NOTE

Refer to the applicable drawings in Appendix A of this
manual or in the “Applicable Drawings” appendix of the
pertinent system level manual.


Installation of the Model 960SG-500 Signal Generator consists of inserting the unit into a 3-bay rack chassis, providing
an electrical interface, and performing an operational check. The customer is responsible for securing the monitoring
equipment and for cable interconnecting. The field wiring is shown on the wiring diagrams in Appendix E of the
applicable systems manual. Refer to Appendix B of this manual for the schematic diagram. Upon completion of field
installation, perform a point-to-point continuity check to verify that all external wiring connections are secure. Use
the pawl fastener to secure the signal generator in place.