Grip Factory Munich GF-Jib Arm User Manual

Gf-jib arm, Grip factory munich

Advertising
background image

Grip Factory Munich

YOUR INNOVATIVE PARTNER FOR CAMERA SUPPORT

GF-Jib Arm


Note: Prior to assembly, ensure that the base dolly the jib will be mounted on is
positioned on a flat, stable, level surface. Ensure that all locking pins (1 & 2) are
inserted and all pan and tilt brakes and drag locks (6, 7 & 8) are locked.

The respective protective clothing e.g. gloves, should be worn.

1. Mount the jib on the dolly and lock securely with the wing nut (9) located on the pivot
section.



1

2

1. Front locking pin
2. Rod locking pin
3. Extension lock 1
4. Extension lock 2
5. Pivot section

3

4

5

7

8

6

6. Tilt drag
7. Tilt brake
8. Pan lock

9

9. Wing nut lock
10. Hand crank
11. Counterweight rod
lock

10

11

Advertising