Set-up & delivery guidelines (cont.) – Dynasty Spas 2008 User Manual

Page 9

Advertising
background image

Dynasty Spas Operator’s Guide • www.dynastyspas.com

9

SET-UP & DELIVERY GUIDELINES (CONT.)

It is the customer’s responsibility to acquire necessary permits and to
arrange for installation and hook up of the electrical power by a
licensed electrician.

NOTE!

3” Concrete Pad

Getting Ready For Delivery & Set-up Of Your New Spa

Electrical Requirements

•

Your 220 Volt spa pack will require a double pole 50 amp dedicated
GFCI, ground fault circuit breaker.

•

Extension cords are not to be used in conjunction with operation of the
spa. Low voltage damage could result, which is not covered by warranty.

•

If you have any doubts, have your electrical system checked by a
licensed electrician.

5’ Minimum

Advertising