Follow box instructions for a concrete pour. Once
concrete is cured, remove mudcap from boxes.

1

teRRazzo InstallatIon:

Attach FP-CTR flange and cover using the four (4)
#10-24 screws provided.

2

Pour terrazzo finish to top edge of flange and cover.

3

After the terrazzo has set and all floor polishing is
completed you can now continue the activation by
replacing the FP-CTR cover with a Floor Port Series
Cover (sold separately) and adjust height of cover
using the provided shims to ensure that cover is flush
with the flange edge.

4

note: fPfftc cover shown in illustration. fP-ctR

trim Ring also works with floorPort series

covers fPctc and fPbtc.