Legrand SGT-ACT User Manual

Page 2

Advertising
background image

7. After all the power and low voltage connections have been made, the box is ready to be inserted into the panel. The

locking tabs should be adjusted below the box flange about 1/4" [6.4mm] greater than the thickness of the panel. The tabs
are adjusted by turning the screws located just underneath the cover. The tabs should be turned towards the box prior to
the insertion.

8. Insert the back of the box through the hole and rotate the box so the back extends underneath the panel and lower the front

flush with the panel.

9. Once the box is in place, tighten the locking screws. The tabs will rotate outward and travel up the locking screws until they

pull snug up against the underside of the panel.

10. Take the 8" x 6" [203mm x 152mm] carpet blank remaining from the box opening, and cut a 7 1/4" x 4 7/16" [184mm x

113mm] blank and glue it in the top of the lid.

11. When this box is not in service, the wire retainer should be installed (textured side up) to block off the cable exit. Otherwise,

any exiting cables should be routed through the wire retainer prior to closing the lid.

The Wiremold Company
U.S. and International:
60 Woodlawn Street • West Hartford, CT 06110
1-800-621-0049 • FAX 860-232-2062 • Outside U.S.: 860-233-6251
Canada:
850 Gartshore Street • Fergus, Ontario N1M 2W8
1-800-741-7957 • FAX 519-843-5980

IJ0100 R1 0403

© Copyright 2003 The Wiremold Company All Rights Reserved

Advertising