Figure 3 – ht riser figure 4 – hdr riser – Legrand WC Cellular Raceway Risers User Manual

Page 2

Advertising
background image

Figure 3 – HT Riser

Figure 4 – HDR Riser

Terminal Bushing.

Extension CBRE-P.

For CBR and CRB1
4 1/8" [105mm].

Field Cut Openings:
CBR-HT Cut One
2 1/2" x 6" Opening.
CBR1-HT Cut One
2" x 5 1/2" Opening.

Field Cut Openings:
HDR Riser Cut One
2" x 5 1/2" Opening.

Center Line.

WCR2 (Shown).

Headerduct.

HDR Riser.

End Closure – JBHEC.

CBR.

1. Field cut opening in raceway

(see Fig. 3 for HT Riser and
Fig. 4 for HDR Risers).

2. Install grommets in holes. Cover

all sharp edges exposed to wires.

3. Pop rivet or fillet weld riser in place.

Exposed screw threads are not
allowed inside of raceway.

4. Install riser extension and terminal

bushing as required.

5. Install headerduct end closure as

shown (see Fig. 4).

4 1/8"

[105mm]

24" – 36"

[610mm to 914mm]

24" – 36" [610mm

to 914mm]

12"

[305mm]

12"

[305mm]

3 1/2"

[89mm]

6"

[153mm]

30"

[762mm]

6"

[153mm]

3 1/2"

[89mm]

Wiremold

U.S. and International:
60 Woodlawn Street • West Hartford, CT 06110
1-800-621-0049 • FAX 860-232-2062 • Outside U.S.: 860-233-6251
Canada:
570 Applewood Crescent • Vaughan, Ontario L4K 4B4
1-800-723-5175 • FAX 905-738-9721

1 000 591R1 0310

© Copyright 2010 Legrand/Wiremold All Rights Reserved

Advertising