Drolet 1800 EPA User Manual

Page 14

Advertising
background image

13

6- You can start to add chimney sections. We recommend that you also use locking bands to

secure all connections. You will need to secure the chimney to the house using wall bands.
Wall bands wrap around the chimney and then attach to the wall. Install the first one 3 feet
above the wall support. Then, you will need another band for each 8 feet of chimney. Note: if
your
chimney must be installed through your soffit, install a roof flashing above and
finishing
plate below where the roof is cut. Consult the following section called “CEILING
SUPPORT SYSTEM” for more details.


7- Authorities require that the chimney extend not less than 3 feet above the highest point where it

passes through the roof of a building and not less than 2 feet above any portion of the building
within 10 feet. If the chimney extends more than 5 feet above the roof deck, roof guys with
telescoping legs and draw bands are required.






Advertising