MPT12 Manual

26 Mar 2014

SECTION 5

Maintenance and Repair

5-2

7. Mix Epoxy or Urethane coating according the

manufacturer’s instructions.

8. Apply coating with roller or natural haired brush.

Ensure coating in applied at the manufacturer’s
recommended thickness. See MSDS sheet for
details.

9. Allow sufficient time for the coating to cure

before filling tank with water.

Leaks
1. Remove paint and corrosion from suspected area.
2. Weld over leak.
3. Prime and paint over weld.

Structure
Contact MEGA Product Support for assistance on
major structural repair at US toll free: 1-800-345-8889
Direct: 1-505-345-2661 or visit our website at

www.megacorpinc.com

for more detailed contact

information.

FLOAT ADJUSTMENT

SINGLE FILL PIPE

1. Open flow control valve all the way. then close.

2. Open flow control valve 3 to 3-1/2 turns.

3. Start fill.

4. Water should be coming out of float valve (if not

open flow control valve ¼ turn).

5. Pull up on float.

6. If water will not shut off, close flow control

valve ¼ of a turn.

7. Pull up on float (adjust control valve until water

shuts off ).

DOUBLE FILL PIPE

1. Make sure both shut off valves are open before

adjusting.

2. Open flow control valves on both fill pipes all the

way. then close.

3. Open flow control valves on both fill

pipes 3 to 3-1/2 turns.

4. Start fill.

5. Water should be coming out of float valve (if not

open flow control valve ¼ turn).

6. Pull up on float.