Metro Mounting Post to Dolly - “B” PLATE CASTER User Manual

Page 2

Advertising
background image

aSSEMbLy INSTrucTION FOr

MOuNTING POST TO DOLLy -

“c” PLaTE caSTEr

1. Remove and discard the existing leveling bolt

that comes with the post (Super Erecta only).

2. Mount “C” plate casters as shown with the

caster hardware provided.

3. Align the bottom of the posts (threaded insert

(SES) or levelling foot (MetroMax & MetroMax

Q) over the large holes in “Z” channel frame.

(Make sure levelling feet for MetroMax &

MetroMax Q are screwed all the way in before

assembling).

4. Place a flat washer and lockwasher onto a

3

/

8

-16 x 2

3

/

4

" hex head bolt (all provided in

the dolly hardware bag) and insert thru the

underside of the dolly thru caster and “Z”

channel frame, and into the post as shown.

Make sure that the washers are positioned

as shown.

5. Tighten all bolts securely as required.

NOTE:

This assembly instruction

applies to “C” plate casters

only — please see reverse side

for “B” plate applications.

caSTEr harDwarE

3

/

8

DIa. LOcKwaShEr

“Z” chaNNEL

LarGE hOLES IN caSTEr PLaTE

3

/

8

-16 x 2

3

/

4

" LG. hEx hEaD bOLT

SMaLL hOLES IN caSTEr PLaTE

3

/

8

DIa. FLaT waShEr

“u” chaNNEL

buMPEr

“c” PLaTE caSTEr

®

InterMetro Industries corporation

North Washington Street, Wilkes-Barre, PA 18705

For Product Information Call: 1-800-433-2232

Visit Our Web Site: www.metro.com

POST – SuPEr ErEcTa,

METrOMax Or METrOMax Q

(SuPEr ErEcTa ShOwN)

ThrEaDED INSErT (SES)

Or ThrEaDED LEvELEr

(METrOMax & METrOMax Q)

Advertising