Installation instructions for qualified personnel – REMKO SV 261 User Manual

Page 17

Advertising
background image

Installation instructions for qualified personnel

■

Transport the unit in its original
packaging as close as possible
to the installation location.This
avoids transportation damage.

■

Check that the packaged
contents are complete and
inspect the unit for any visible
signs of transportation damage.
Immediately notify any
deficiencies to the contractual
partner and forwarding agent.

■

Lift the unit by its corners
and not the refrigerant or
condensation connections.

■

Insulate the refrigerant pipes
(injection and suction pipe),
valves and connections to make
them tight against vapour
diffusion.If necessary also
insulate the condensation pipe.

■

Select an installation location
which allows air to freely
flow through the inlet and
outlet.(see section "Minimum
clearances").

■

Do not install the unit
adjacent to any hotspots.Unit
performance will be impaired if
installed next to hotspots.

■

Only open the stop valves
for the refrigerant pipes after
installation has been fully
completed.

■

Use caps or adhesive tape to
seal off the open refrigerant
pipes and prevent the ingress of
humidity.
Never kink or push in the
refrigerant.

■

Avoid unnecessary bending.
This minimises the pressure
loss in the refrigerant pipes and
ensures that the compressor
oil can flow back without
obstruction.

■

Special measures concerning
the oil return pipe must be
taken if the outdoor component
is mounted above the indoor
unit.
(See section "Oil return
measures").

■

Add refrigerant if the basic
length of the refrigerant pipe
exceeds 5 metres.
The amount of additional
refrigerant is given in the
chapter "Adding refrigerant".

■

Only use the union nuts
supplied with the refrigerant
pipes. These should only
be removed shortly before
connecting the refrigerant
pipes.

■

Establish all electrical
connections in accordance with
the relevant DIN- and VDE
standards.

■

Connect the electrical cables
properly to the terminals.
Otherwise there is a risk of fire.

■

Service openings should be
provided in the suspended
ceiling to allow maintenance
access to the control box.

■

Any ventilation ducts or pipes
and connection fittings, which
are used to connect a second
room or supply fresh air, should
be insulated with

diffusion-tight

material.

Wall breakthroughs

■

The wall breakthrough must
have a diameter of min. 70 mm
and a fall of 10 mm from inside
to outside for each indoor unit.

■

We recommend that the
inside of the hole is padded or
lined, e.g. using a PVC tube,
to prevent the pipes being
damaged.

■

After installation has been
completed, use a suitable
sealing compound to close
off the wall breakthrough
(responsibility of customer).
Do not use cement- or lime-
based materials!

Important points prior to
installation

Control cable

Condensation pipe

Injection pipe

Suction pipe

PVC tube

Pipes and cables in wall breakthrough

17

Advertising