Remko rvs...h (inox), Installation instructions for qualified personnel – REMKO RVS xxx H User Manual

Page 18

Advertising
background image

Installation instructions for qualified personnel

■

To install the system it is impor-
tant to follow the installation
instructions for both the chiller
and the chilled water system
(indoor system) or heating
system when installing the
entire system.

■

The indoor system and the
chiller work independently. A
connection between the two is
not necessary.

■

Transport the unit in its original
packaging as close as possible
to the installation location to
avoid damage.

■

The units may only be moved
upright (installed position) using
appropriate transport equipment
(Figure 1)

.

Secure against tipping!

■

The unit must be kept upright
when transporting to a higher
elevation (Figure 2).

■

Check that the packaged con-
tents are complete and inspect
the system for any visible signs
of transport damage.
Report any damage immediate-
ly to your contract partner and
the shipping company.

■

Select an installation location
with free air movement both
for the inlet and outlet. See
section “Minimum clearances”.

■

Do not install the unit in the
immediate vicinity of devices
with intensive thermal radia-
tion, this will reduce the cooling
capacity.

■

Lift the unit only at intended
lifting points. Never stress the
medium or refrigerant pipings.

■

The medium connection lines,
valves and connections must be
insulated against vapour
density. If necessary, also insu-
late the condensate line (only
units with HP-function). In dual
systems with cooling and
heating modes, the
requirements of the current or
other local law (EnEV) are to be
complied with.

■

Seal off open lines against dirt
and never kink or crimp the
lines.

■

Avoid unnecessary bending.

■

Establish all electrical connec-
tions connections in accordance
with the relevant DIN- and VDE
or other local standards.

■

Always fasten electric wiring
properly to the terminals,
otherwise there is a risk of fire.

■

Comply with all regulations
governing structural and build-
ing requirements and conditions
with regard to the installation
site.

■

In the selection of the installa-
tion site, pay attention to the
site itself and to any possible
noise reflexion from the sur-
roundings.

■

To avoid the transmission of
vibrations the units must be
installed on vibration absorbing
material or on vibration iso-
lated foundations. In doing so,
make sure that the lines are also
vibration isolated.

■

If the installation site must fulfil
special noise emission require-
ments, this must be done on
site where appropriate adjust-
ments can be made. In this
cases, please consult a noise
level expert.

Important information
before installing

1 Correct way to move

2 Correct way to lift

Lifting point

REMKO RVS...H (INOX)