Removal and replacement: bin controls – Scotsman NME454 User Manual

Page 25

Advertising
background image

BIN CONTROLS (Ice Level Sensors)
1. Disconnect electrical power.
2. Remove front panel.
3. Remove control box cover.
4. Locate ice chute, at the base of the chute, in
front of and behind it are two plastic bin control
mounts.
5. Slide each bin control to the left, and in the
control box, disconnect the electrical leads
connecting the bin control to the circuit board.
6. Reverse to reassemble, be certain that the bin
controls are aligned so that the ice level sensors
are visible (centered) through the holes in the ice
chute.

NME454, 654 & FME504, 804

January 2007

Page 25

ICE

CHUTE

SLIDE BIN

CONTROLS

LEFT AND

RIGHT

REMOVAL AND REPLACEMENT: Bin Controls

RESERVOIR
1. Shut off water supply.
2. Remove front panel.
3. Remove reservoir cover.
4. Disconnect water inlet tube from reservoir inlet
fitting.
5. To remove float valve, push in on “Locking Tab”
as shown and pull valve up.
Note: The plunger/seat is available as a separate
part.
6. To remove reservoir, pull up and remove water
sensor.
7. Disconnect water outlet tubes.
8. Remove the two screws holding reservoir to
bracket.
9. Remove reservoir from ice machine.
10. Reverse steps 1-9 to reassemble.

LOCKING

TABS

FLOAT

ASSEMBLY

Water

Sensor

Advertising
This manual is related to the following products: