STEP 5a: For through-the-floor water line and electrical

wires, mark another centerline 6 inches (152 mm) from

the back wall (fig. 4).

STEP 5b: For through-the-wall water line and electrical

wires, mark a centerline 8 inches (203 mm) up from the

floor centerline (fig. 5).

STEP 6: Make a 4-3/4 inch (121 mm) diameter hole (for

most floor flanges) or a 5-1/8 inch (130 mm) diameter

hole (for swivel joint floor flange) at the centerline mark

furthest from the wall. Make a 1 inch (25 mm) hole at the

mark closer to the wall for the water line and electrical

wires (fig. 6).

STEP 7: Insert floor flange into larger hole and secure

to the floor with #12x3/4-inch long flat head wood or

sheet metal screws (fig.7).

Fig. 5

Fig. 6

Fig. 4

IMPORTANT: The prefered floor flange installation

method is to mount the floor fIange directly on the

finished floor. However, if the bottom of floor flange

and bottom of china toilet must be mounted at differ-

ent heights, the floor flange must be mounted within

3/8 inch (10 mm) of the bottom of the toilet (see il-

lustrations in next column) or leakage may result.

Below-Floor Installation

STEP 8: Route 1/2-inch (13mm) PEX tubing through

the smaller hole and install a PEX 1/2-inch MPT fitting

(fig. 8).
NOTE: A water shut-off valve should be installed in the

water line to the toilet for maintenance requirements.