Thermon PETK-10 User Manual
Page 7
Advertising

Step 8
Mount the CKTES/PETK on a flat surface, with expansion loop of 150 mm in the cables. Heating Cable/Cold Leads
and joint secured in place using fibre fixing tape. Application of tape shall allow a small degree of movement at the
joint and cables to cater for potential expansion and contraction of the pipeline. Do not over-tighten.
Step 9
Do not move the assembled CKTES/PETK for minimum 24 hours for complete curing.
Installation Instructions
6
150 mm
150 mm
Form TEP0107U-0512 © Thermon Manufacturing Co. Information subject to change.
Advertising
This manual is related to the following products: