Terminator, Zp-r-xp, Installation procedures – Thermon ZP-R-XP User Manual

Page 3

Advertising
background image

3

1.

Cut end of cable at angle to aid in piercing

grommet. Leave additional cable for

expansion loop. See page 4 for multiple

cable installation tips.

4.

Insert banding guide into expediter and

snap into place.

2.

Insert cable into expediter. If mounted on

bottom or side of pipe, punch out weep

hole.

3.

Slide expediter toward pipe and route

cable through support base entry.

7.

Terminate cable with appropriate PETK

termination kit. Refer to PETK installation

instructions.

8.

Push excess cable back through

expediter. Tighten cap securely. Tape

cable expansion loop to pipe.

5.

Mount expediter to pipe using pipe band.

Do not band over cable.

6.

Cut off end of cable.

9.

Mount junction box base on expediter. Make

sure to align slots to properly orient junction

box base. Tighten nut with Terminator-LN-

Tool. If mounting horizontally, threaded

gland holes must face downward.

Terminator

TM

ZP-R-XP

INSTALLATION PROCEDURES

Advertising