Westermo ODW-632 User Manual

Page 25

Advertising
background image

25

6650-2253

Multidrop application
Follow the steps below to get the unit up and running in a simple application.

Prepare the units

Configure the network, with master and slaves. Check that it is running correctly with

the electrical serial network.
Prepare the fibre optical network
Multidrop, mid units (CH 1 & CH 2). Set switch S2:1 and 2 to ON.

Multidrop, end units (CH 1 only). All switches should be set to OFF if it is

protocol independent and Switch S2: 1 to ON if it is protocol dependent.
Connect the fibre links between the units.

Connect the power supply to all units.

• The Fibre links should be in operation, indicated by active CH 1 and CH 2 LED’s.
Connect each of the slaves to the serial port of the corresponding ODW-632.

Connect the master to the port of one ODW-632

The Multidrop application is up and running.


Note! ODW-621 or ODW-631 can be used as end units.

TX

RX

TX

RX

TX

RX

TX

RX

TX

RX

TX

RX

TX

RX

TX

RX

CH 2

CH 1

CH 2

CH 1

CH 2

CH 1

CH 2

CH 1

PLC

Slave

PLC

Master

PLC

Slave

PLC

Slave

Advertising