Installation tools, Accessories provided with the router, User-supplied tools and equipment – H3C Technologies H3C MSR 930 User Manual

Page 10: Pre-installation checklist

Advertising
background image

3

Installation tools

Accessories provided with the router

•

Power cord

•

Console cable

•

Ring terminal

User-supplied tools and equipment

•

Phillips screwdriver

•

Flat-blade screwdriver

•

Wire-stripping pliers, needle-nose pliers

•

Screws with various specifications

•

Meters and equipment such as HUB, terminal, and multimeter

•

ESD-preventive gloves or wrist strap, ESD-preventive mat, anti-static bags

•

Electric drill (for wall-mounting the router)

•

Hammer

Pre-installation checklist

Table 4 Pre-installation checklist

Item Requirements

Yes No

Installation
site

Ventilation

•

There is a minimum clearance of 10 cm (3.9 in) around

the router chassis intake and exhaust vents for heat
dissipation.

•

The installation site ventilation system is adequate.

Temperature

0°C to 40°C (32°F to 104°F)

Relative humidity

5% to 90% (noncondensing)

Cleanness Dust

concentration

≤ 3 × 10

4

particles/m

3

ESD prevention

•

The equipment and floor are properly grounded.

•

The equipment room is dust-controlled.

•

Humidity and temperature are maintained at proper

levels.

•

Wear an ESD-preventive wrist strap when inspecting or

handling a circuit board.

EMI prevention

•

Take measures to protect the power system from the

power grid system.

•

Keep the protection ground of the router as far away

from the grounding device or lightning protection

grounding device as possible.

•

Keep the router far away from radio transmitters, radar,

and high-frequency or high-voltage devices.

•

Use electromagnetic shielding when necessary.

Advertising