Diagram i – ShoreLand'r SL20AL User Manual

Page 9

Advertising
background image

Midwest Industries, Inc.

Ida Grove, IA 51445

800.859.3028

www.shorelandr.com

0003625

Page 9

3/07/06

WINCH POST ASSEMBLY

(See Diagram I). The height that the bow eye is placed in your boat

will determine the length winch post required. Once this is deter-

mined, attach the winch base to the tongue with three 1/2” x 4-1/2”

carriage bolts and lock nuts.

Align the holes in the Profile 2000 mounting channel with

the holes in the top of the winch base. Attach the front of the

winch head mounting channel to the base by placing a 1/2”

x 4-1/2” hex bolt through the hole closest to the front of the

winch base. Secure with a 1/2” lock nut. Do not tighten.

Diagram I

Note that the winch head can now be rotated either up or down.

Identify the correct hole combination to use to position the bow eye

roller just above the bow eye of your boat when the boat is placed

on the trailer. When determined, secure in this position by plac-

ing the bushing as shown in Diagram I inside the winch base so it

aligns with the hole just identified for the proper adjustment. Insert

another 1/2” x 4-1/2” hex bolt through the determined mounting

hole in the mounting channel and winch base making sure the bolt

passes through the bushing as well. Secure with a 1/2” lock nut.

Tighten all bolts.

Advertising