Tire size and carrying capacity chart – ShoreLand'r SLB46TABBS User Manual

Page 9

Advertising
background image

Midwest Industries, Inc.

Ida Grove, IA 51445

800.859.3028

www.shorelandr.com

0003717

Page 9

11/14/06

Tire Size and Carrying Capacity Chart

Tire Size .......................

ST215/75R 14C

GVWR .......................... 5920 lb.

Carrying Capacity ....... 4600 lb.

Axle .............................. Disc Brakes

Refer to the tire side wall for correct tire pressure.

ROCKER ARMS

Locate the rocker arms (Ref. No. 6 of Detail F in Diagram D. Note

that the center bushing has a grease zerk in it. Position the rocker

arms up into the center channel welded in the center of the tandem

spring bracket so that the grease zerk is pointing down. Align the

holes in the channel with the rocker arm. Secure in place with a 3/4”

x 4-1/2” hex bolt and lock nut. Tighten. Repeat this process on the

other rocker arm and spring bracket. Grease the rocker at this time

by applying grease through the zerk just discussed.

NOTE: The grease zerk is positioned down so that it is accesible

for servicing when needed.

SPRINGS

Position the axles so they are properly aligned with the trailer.

Position the brake axle so that the disc brake calipers are on the

back side of the axle. The brake axle must always be mounted as

the rear axle to give you the best braking possible (See Diagram

D. There is no right and left to the axle without brakes. It can be

mounted either way.

Place the springs on the topside of the spring pads welded to the

axle. (See chassis diagram). Note that the hook end of the spring

must be to the rear of the trailer. Place a spring clamp on the top

center of the spring as shown. Next place the 1/2” x 6-1/2” U-bolts

down over the top of the spring clamp, spring and axle as shown.

Place the spring and axle U-bolt plate onto the ends of the two U-

bolts just placed. Secure in place with 1/2” lock nuts. Thread onto

the U-bolts but do not tighten securely until the complete unit is in

position on the trailer. Repeat on the other spring.

AXLE

Place one of the spring bracket bushings into the rear of the spring

bracket and secure with a 9/16” x 3-1/4” hex bolt and hex lock nut.

Repeat in other spring bracket. Position the rear axle under the

frame, then hook the loop of the springs around the bushings just

installed. Note that if the axle is positioned too low when trying to

hook, the loops will not hook around the bushings. Raise the front

of the springs up so they align with the rear hole in the axle boogie

just installed. Secure in place with 9/16” x 3-1/4” hex bolts and lock

nuts. Install another spring bracket bushing in the front hole on the

rock arm assemblies. Secure with a 9/16” x 3-1/4” hex bolt and lock

nut. Tighten. Hook the hook end of the springs mounted to the front

axle over the bushing just installed in the rocker arm assembly.

Then swing the front of the spring up and attach the front mounting

hole in the spring bracket with another 9/16” x 3-1/4” hex bolt and

lock nut. Tighten all axle U-bolts and spring bolts.

ONE AXLE BRAKE INSTALLATION

Cut the tape securing the brake line hose to the axle. Remove the

brass plug from the port in the brass block on the right brake cali-

per. Thread in the brake hose male end and tighten to 6-8 ft. lb. or

else 72-96 in. lb. of torque.

DO NOT OVER TIGHTEN. Over tight-

ening will cause the brass block to crack and then leak. Place the

other end of the hose up through the hole provided in the brake line

clip bracket. Secure in place with the U-shaped hose clip provided.

Advertising