ShoreLand'r SLRB40TBXLW V.2 User Manual
Page 3
Advertising

Midwest Industries, Inc.
Ida Grove, IA 51445
800.859.3028
www.shorelandr.com
0003459
Page 3
FINAL ASSEMBLY INSTRUCTIONS
Remove the hardware bag from the frame, remove
parts and sort by size.
RB SERIES
The RB-series rear bunk assembly is installed by plac-
ing the bunk assembly mounting channel over the rear
cross member and securing in place with a 1/2” x 4-
1/4” hex bolt and lock nut. (See Diagram A). Tighten
only enough to hold in position until the boat is placed
on the trailer. Repeat on the other RB-bunk assem-
bly.
The short stabilizer bunk is installed to the adjustable
bunk bracket on the front cross member with a 3/8” x
1” hex bolt and lock nut. (See Diagram A, Detail B).
Advertising