ShoreLand'r SLXR40TBLW V.1 User Manual

Page 12

Advertising
background image

Midwest Industries, Inc.

Ida Grove, IA 51445

800.859.3028

www.shorelandr.com

0003452

Page 12

REV A 10/18/06

XR SERIES

The XR-series roller rack is installed by placing the

roller arm assembly mounting channel over the rear

cross member and securing in place with a 1/2” x 4-

1/2” hex bolt and lock nut. (See Diagram A). Note that

it should be left loose until the boat is placed on the

trailer. Once the proper positions is determined, it may

be tightened. Repeat on the other roller arm assem-

bly.

The short stabilizer bunk is installed to the adjustable

bunk bracket on the front cross member with a 3/8” x

1” hex bolt and lock nut. (See Diagram A).

Advertising