SS1200G & SS1201G Loadguide Mounting Instructions

Break the bundle and sort all items.

Locate the load guide weldment mounting bracket. Note that

it has three pockets welded to it, one on the side and two on

top. Locate a ½” square nut and insert it into the inside of

one of the pockets. Push it in until the hole in the nut aligns

with the hole in the pocket. Thread a ½” x 1 ½” hex bolt

into the square nut just installed. Thread the bolt into the nut

until the bolt is flush with the other side of the nut. Repeat

this process on the other pockets on the weldment mounting

bracket.

Locate the U-bolts for attaching the weldment mounting

bracket to the frame. Drop the U-bolts down over the frame

from the top as shown in the picture. Raise the weldment

mounting bracket up under the bottom side of the frame,

align the U-bolts with the holes in the weldment mounting

bracket and secure with ½” lock nuts provided. Position the

load weldment mounting bracket in the desired location and

tighten.

Place the load guide tube into the weldment mounting

bracket as shown and slide it in until the desired clearance

is achieved between the load guide and your boat. This may

need more adjusting to obtain proper loading and unload-

ing. Once located, tighten the ½” x 1 ½” hex bolts installed

in the pockets earlier starting with the bolt in the side of the

weldment bracket first. This will straighten the load guide up

so it is perpendicular to the frame. Then tighten the two re-

maining ½” x 1 ½” bolts on the top of the weldment mounting

bracket. These are used to keep the load guide from moving

in and out during loading.

Repeat the above process on the other load guide for the

other side of the trailer. Installation is complete.