7  Electrical Connection

Installation Manual

SI30M-44M-60H-80H-IA-en-30

61

Checking the wiring of the communication products

Checking the system devices

7.7 Sealing and Closing the Sunny Island

Figure 19: Position of the cable glands and the cable feed-through plate

Test point

Test criterion

OK

Electricity supply to communication

products

The plug-in power supply units are plugged in.

□

The communication products are connected to an electricity supply.

□

Termination of the communication buses

The communication buses are connected to the first and last device

in the bus.

□

Test point

Test criterion

OK

System devices

All system devices are correctly connected (see the manuals for the

devices).

□

Ensure by measuring that all system devices are connected with the

same ground potential.

□

Connection AC1 in the off-grid system

The stand-alone grid or the Multicluster Box is connected to the

AC1 Loads/SunnyBoys terminals.

□

Connection AC2 in the off-grid system

The generator is connected to connection AC2 Gen/Grid.

□

The neutral conductor is connected to the terminal AC2 Gen/

Grid N.

□

Position

Designation

A

Cable glands

B

Cable feed-through plate