10 Decommissioning
SMA Solar Technology AG
48
PPC-BE-P7-en-13
Operating Manual
10 Decommissioning
10.1 Disassembling the Power Plant Controller
Requirement:
☐ The supply voltage must be externally disconnected.
Procedure:
1. Open the door of the Power Plant Controller.
2. Remove all network cables and optical fibers.
3. Disconnect all signal cables.
4. Remove the voltage supply cable.
5. Release the cable glands.
6. Pull all cables out of the cable glands and the cable feed-through plate.
7. Disassemble the Power Plant Controller.
10.2 Disposing of the Power Plant Controller
• Dispose of the Power Plant Controller in accordance with the locally applicable disposal regulations for electronic
waste.