SMA SB 3300 Installation User Manual
Page 31
Advertising

SMA Solar Technology AG
Electrical Connection
Installation Guide
SB33_38-IEN111851
31
4. Push the bolted connection toward the thread and fasten to a tightening torque of 2 Nm.
☑ The DC connectors are now assembled and can be connected to the inverters, as described in
section 5.5.4 ”Connecting the PV Generator (DC)” (page 33).
☑ If the conductors are not visible in the
hollow cavity, the cable is not in the correct
position.
• Loosen the clamping bracket. For this
purpose, use a screwdriver with a width of
3.5 mm.
• Remove cable and start again from step 1.
Result
Measure
Advertising
This manual is related to the following products: