6 mounting the string monitoring box, Mounting the string monitoring box, 6mounting the string monitoring box – KACO Powador Argus 16S DCS User Manual

Page 12: Installation space, Wall

Advertising
background image

Mounting the String Monitoring Box

Page 12

Operating Instructions Powador Argus 16S DCS, 24S DCS_EN

Authorised electrician

6

Mounting the String Monitoring Box

Installation space

•

Ensure good access to the unit for installation or any service work that may later be required.

•

Maintain the following minimum clearances around the unit:

100 mm clearance between two string monitoring boxes installed side by side,

500 mm clearance between two stacked string monitoring boxes,

500 mm to cabinets, ceilings, etc.

•

To prevent integrated components from overheating, do not place the box where it would be exposed to direct

sunlight.

Wall

•

The unit is designed for vertical wall mounting.

•

Ensure that the wall has adequate load-bearing capacity and use appropriate fixing materials.

•

The wall surface must be as even as possible to prevent the housing from warping or losing its seal when it is screwed

onto the wall.

•

Be sure to install the string monitoring box in a sufficiently elevated place, especially in areas prone to flooding.

•

Installation at eye level makes it easier to read the display on the inside of the box.

CAUTION

Use suitable mounting parts.

›

Use only the supplied mounting parts.

›

Mount the string monitoring box upright on a vertical wall.

NOTICE

The Powador Argus string monitoring box meets the requirements of protection rating IP56 if all

cable fittings are used or suitably closed off. In order to ensure a long service life for your units,

make sure they are installed in a dry location where they are not directly at risk of weathering.

Figure 2: Dimensions of the string monitoring box

(in mm)

Figure 3: Dimensions of the string monitoring box

(in mm)

m

ax

. 6

55

60

0

800

300

Advertising
This manual is related to the following products: