0 nic setup and testing, 1 jumper placement, Figure 8 jumper positions – Emerson MONITORING OpenComms User Manual

Page 31: Nic s, Etup, Esting, Jumper placement, Figure 8, Jumper positions, 0 nic s

Advertising
background image

NIC Setup and Testing

25

6.0

NIC S

ETUP

AND

T

ESTING

The NIC has a specific setup that must be in place before the card will

function properly. There are jumpers on the board that must be in the

correct locations. The positions of these jumpers are numbered on the

board itself. A small triangle silk

Advertising