Installation – Enviro Kodiak 1700 Fireplace Freestanding User Manual

Page 34

Advertising
background image

34

Installation

5. Mount the block-off plate

using masonry screws in a

masonry fireplace and sheet

metal screws on a zero-

clearance fireplace (screws

need only be long enough

to penetrate the first layer of

metal).

6. Insulate the block-off plate

using

high-temperature

fiberglass insulation and

furnace cement.

Masonry Fireplace

Mantel

Damper removed

or fastened open

Surround Panel

USA 16” (406 mm)

CND 18” (450 mm)

Block-off plate or

damper adaptor.

The stainless steel

chimney connector must

extend 12" (305mm) past

the block-off plate.

Mantel

Surround Panel

USA 16” (406 mm)

CND 18” (450 mm)

Block-off plate or

damper adaptor.

Stainless steel chimney

connector must extend

12" (305mm) past the

block-off plate.

Damper must

be removed

Zero-clearance

(metal) firebox
IMPORTANT:
DO NOT modify

any part of the

ZC fireplace

7. After installing the unit into place and

the pipe through the block-off plate,

use high-temperature fiberglass

insulation and furnace cement to seal

any gaps between the pipe and block-

off plate (allow the cement to dry for

at least 24 hours before burning).

Before starting this type of installation

refer to I

NSTALLATION

- M

ASONRY

F

IREPLACE

I

NSTALLATION

- I

NSERT

for additional

information. For clearances refer to

S

PECIFICATIONS

- C

LEARANCES

T

O

C

OMBUSTIBLES

-

1200 I

NSERT

and S

PECIFICATIONS

- C

LEARANCES

T

O

C

OMBUSTIBLES

- 1700 I

NSERT

. See Figure

40 and 41 for examples of a masonry

fireplace and a zero-clearance fireplace

with a direct connection

Figure 40: Insert Install into a Zero-Clearance Fireplace.

Figure 41: Masonry Fireplace Direct Connection Insert Install.

Advertising
This manual is related to the following products: