Phase 4 - assembly of fire bed (element 2) – MCZ Guttuso User Manual

Page 10

Advertising
background image

INSTALLATION AND USE MANUAL

Chapter 3

GUTTUSO

page

10

Chapter 3

Technical service – all rights reserved by mcz spa
Reproduction prohibited

3.5. PHASE 4 - ASSEMBLY OF FIRE BED (element 2)

N.B. USE CARE WHEN HANDLING STAINLESS STEEL PARTS TO PREVENT IRREPARABLE

SCRATCHES.
N.B. THE FIRE BED OF THE GUTTUSO CLADDING (IN BOTH THE STAINLESS STEEL AND PIASENTINA

STONE VERSION) MUST BE SUPPORTED DURING ASSEMBLY, SINCE THE WEIGHT OF THE VISIBLE

PART CAUSES THE PIECE TO OVERTURN. IT IS STRONGLY ADVISABLE TO PLACE THE SUPPORTS

UNDER THE FIRE BED TEMPORARILY UNTIL FASTENING IS COMPLETE.

Move the fire bed (element 2) near the counterpart. Perforate the counterpart at the threaded bars (d. 6mm) in

the back part of the fire bed.

FORO PER

BARRA

FILETT.

FORO PER
BARRA FILETT.

MONTANTI
IN ACCIAIO

MONTANTI

IN ACCIAIO


Move the fire bed to the counter-wall, inserting the threaded bars in the previously created holes. Fasten the fire

bed using the nuts provided (nuts M6 stainless steel). For greater safety, it is advisable to use 2 nuts for each

threaded bar (nut and locking nut).
When assembly is complete, remove the temporary supports.

Advertising