MCZ Mondrian User Manual
Page 16

INSTALLATION AND USE MANUAL
Chapter 3
MONDRIAN
page
16
Chapter 3
Technical service – all rights reserved by mcz spa
Reproduction prohibited
3.11. PHASE 10 – MARBLE TOP (element 9)
Set the marble top on the column and steel frame.
The pins of the column must fully enter the holes in the lower part of the top.If necessary add marble cement to
prevent small movements of the pins in the holes.
The lower protuberance of the top must enter the steelframe, which is specially shaped for precise adjustment of
the top. In the unloaded part of the steel frame there are 2 mobile screws M6. The marble top rests on their
heads. After adjusting the height of the screws, it is advisable to add a small amount of marble cement to the
heads of the screws. When assembly is complete, the top must be flush with the marblecolumn and close
perfectly against the column and steel frame (see drawing).