Emerson Process Management BETTIS G01 User Manual

Page 39

Advertising
background image

Bettis P/N 124840E

Revision “B”

Page 35 of 46

HEX CAP SCREWS (7-20) TORQUE TABLE

TORQUE ±5 % Percent

TORQUE ±5 % Percent

HOUSING

MODEL

(FT-lb.)

N-m

HOUSING

MODEL

(FT-lb.)

N-m

G01

30

41

G7

135

183

G2

30

41

G8

240

325

G3

30

41

G10

285

386

G4

65

88

G13

340

461

G5

65

88

5.2.15 On M3, M3HW and ES models install Monel wire (6-130) through each hex cap screw (7-20)

per the following steps:

NOTE: The following steps provides guidelines for wire locking hex cap screws to

discourage screw loosening and removal in applications where screw removal
could be hazardous.

5.2.15.1

Make sure hex cap screws are tightened to their specified torque.

5.2.15.2

Using required lengths of .31 diameter Monel wire as provided in the
Module ordered. When replacing Monel wire use the following table for
wire length requirements.

LENGTH

LENGTH

MODEL

Inch

mm

MODEL

Inch

Mm

G01-SR

36

914.4

G5-SR

66

1676.4

G2-SR

44

1117.6

G7-SR

79

2006.6

G3-SR

48

1219.2

G8-SR

88

2235.2

G4-SR

55

1397.0

G10-SR

110

2794.0

5.2.15.3

Twist the end of both wires together and insert one through the drilled hole
in the hex cap screw head, pass the second wire over the screw head and
twist it three (3) times around the first wire at a location where the first wire
exits the screw head.

5.2.15.4

Repeat the procedure until the second wire is twist tied to the screw head
through wire of the last screw head.

Advertising
This manual is related to the following products: